Oracle Engineer - Contracting Project

Location: St. Louis, MO, United States Minor Outlying I
Date Posted: 06-12-2016
What needs to be done
 
We need to upgrade Oracle Enterprise Edition from 11.2.0.4 to 12c  12.1.0.2 and latest security patch.
 
  • Operating system: Power 7 and Power 8  AIX 7 LPARS
  • Total number of servers: 47
  • Total number of databases: 99
  • Number of databases currently running 12c: 2
  • RMAN
    • Setup and Verify backups using Oracle wallet
    • Setup RMAN catalog for each database
    • Verify RMAN backups/restores using catalog
  • ASM
    • Number of SAP databases to migrate to ASM: 78
 
  • Setup and test Oracle Restart on upgraded databases
  • Implement Oracle multi-tenant
    • Transfer schemas into PDBs using Data Pump or any other method
  • Completion time.
    • No later than May, 31 2017
 
 
The Timberline Group
Phone: 636-209-5537
PO Box 565, Sullivan, Mo 63080
"Delivering quality solutions through quality people"
or
this job portal is powered by CATS